Product Technical Sheet

BTI 1K 1000 UV PRODUCT DESCRIPTION
It is a polymer modified bitumen rubber based, one component high elastic waterproofing product. It can be easily applied with a brush, trowel or spray machine and provides permanent flexible insulation.

TECHNICIAL SPECIFICATIONS
Material Properties
Composition: Polymer Modified Bitumen Rubber
Color: Brown, black when dry
Density (A / A + B): 1,20 kg / l
Solid Content (A / A + B): 70%
Application Temperature: +5 oC 35 ° C
Service Temperature: -20 ° C to 80 ° C
Mixing Ratio (A / B): 30 KG
Full Drying: 1-5 Days

BENEFITS
It is easy to prepare and apply.
It is a UV resistant product.
It provides monolithic waterproofing.
It fully adheres to the applied surface.
It has high crack bridging feature.
It is a water based product and environmentally friendly.
It can be applied on vertical and horizontal surfaces, it does not flow.

SCOPE OF APPLICATION
As repair product on foundation and curtain walls, wet areas, retaining walls, horizontal and vertical surfaces, roofs, hidden streams, chimney bottoms
It can be used in repairing bitumen membranes, protecting and insulating structures and structural elements that are exposed to leachate, temporary or continuous water pressure, external insulation of water tanks, insulation of basement and parking lot, and bonding boards for insulation and drainage.

APPLICATION DETAILS
Surface Preparation
The application surface must be free of strong, dry, clean and loose parts. Spikes on the surface should be rounded with corners spiral stone and deep gaps should be closed with repair mortar. Internal corners, joints of the walls should be chamfered. The application surface should be primed with solvent-free bitumen primer and application should be started after the primer is completely dry. Surfaces that will decrease the adherence of the material should be roughened.

Lining
The product can be primed by diluting 1/5. The material should be distributed evenly with a suitable brush and applied without horizontal material accumulation. The primer should be allowed to dry and then the actual application should be started. It is recommended to use 0.25 kg / m². Application It should be applied on the prepared surface with brush, trowel or spray at least in 2 coats. After the first coat application, full drying must be done for the second coat application. The second floor should be made perpendicular to the first floor.

PACKING
It can be prepared as 5-20-30 kg in plastic buckets.

STORAGE
Its shelf life is 12 months in an unopened and sun-free environment. Attention should be paid to product circulation and delivery should be ensured with the principle of “FIRST INTRODUCING FIRST EXIT”.

CONDITIONS TO BE CONSIDERED
Application should not be made while it is raining or potentially raining. The first 24 hours after the application should be protected from frost, sun and strong wind. Application should be made to the part of the structure that comes into contact with water. Since curing of the material will be slower in cold weather, it should be ensured that the first layer is completely dry without applying the 2nd layer. Attention should be paid to the application temperature, application should be done in the temperature range of + 5 ° C + 35 ° C.

WARNING and RESPONSIBILITY
If the product is used outside its intended purpose or the application conditions mentioned above are not observed, BTİ Bitüm Teknik İzolasyon San. ve Dış Tic. Ltd. Ltd. Şti is not responsible.

* For the safety data sheet, please read the QR code in the product technical sheet.

Related Items

BTI 2K Classic BTI 2K Latex BTI 2K Plus
BTI 2KT Latex BTI Bitümen Fast BTI Bitum Primer
BTI Moisture Barrier BTI 1K 1000 UV BTI 1K Classic
BTI 1K Latex